Single-source integrator for control rooms, command centres & security operations — everything from one source
control∞rooms endless possibilities Request a consultation →

Control room analysis and planning

In a control room, analysis and planning are not a preliminary step before ordering technology, but the foundation for safe operation. controlrooms GmbH examines room, sightlines, operator workflows, video wall, KVM, ergonomics, acoustics, climate, IT security and serviceability as one interconnected system.

This content comes from an external provider (YouTube, Vimeo or Google Maps) and only loads once you accept marketing cookies.

Successful control room planning – the key to the right control room

The planning phase is the foundation for successfully implementing a control room. Whether you are planning a completely new room or want to modernise your existing control room – careful, well-thought-out planning saves time and costs and ensures optimal results.

New build: early involvement for maximum efficiency

For a new build, we recommend involving us as early as the first planning and construction phase. This allows essential ergonomic and technical requirements to be taken into account early on, such as:

  • the optimal orientation of the room
  • solar radiation and lighting design
  • room heights and acoustics
  • the ideal arrangement of equipment rooms and cable management

Involving us early avoids later adaptation costs and ensures that your control room meets all requirements for ergonomics, efficiency and future-proofing.

Refurbishment: free analysis and individual solutions

If you want to refurbish an existing control room, we start with a free analysis of its current condition. We assess the as-is situation and prepare detailed proposals for modernisation and optimisation – tailored to your needs.

Why is the design of your control room so important?

Control rooms have to meet the demanding requirements of 24/7 operation. Ergonomic workstation design and the sensible integration of technology not only enable smooth processes, but also reduce the physical and mental strain on your staff.

Good design is not a luxury, but essential:

  • Efficient work processes: optimised workstations support smooth processes.
  • Ergonomic solutions: reduce strain and support health.
  • Maximum clarity: clear and intuitive structures improve decision-making.

Norms and standards – safety at the highest level

Our planning is based on the latest guidelines and standards to ensure the highest safety and quality standards:

  • DIN standards: uniform standards for safety and quality.
  • BAuA / BG / VBG (German occupational safety bodies): requirements for occupational health and safety.
  • ASR A1.2 (German technical rule for workplaces): workplace design with a focus on ergonomics and lighting.

By consistently complying with these standards, we create control rooms that are not only efficient and durable, but also meet legal requirements.

Our services – tailored to your needs

From the first analysis to final implementation, we support you with a comprehensive range of services:

  • Site survey and analysis
  • Floor plan and room planning in 3D
  • Sightline studies and workstation design
  • Lighting and acoustic planning
  • Control room console design
  • Relocation of technology and KVM matrix
  • Large-screen solutions and operating concepts
  • Redundancy concepts
  • API interfaces and rack construction
  • Factory and installation planning

Individual consultation – solutions tailored to your control room

On site or online: we are available for a personal meeting. Together we find the optimal solution for your new control room or the refurbishment of your existing one.

Together towards successful implementation

Once these planning steps are complete, nothing stands in the way of smooth implementation. Our experts accompany you from the first idea to completion – reliably, innovatively and always focused on your individual requirements.

Contact us now – we look forward to realising your project.

Project example: ASFINAG Plabutsch monitoring centre – project documentation (PDF, German)

Innovative control room technology: precision in every detail

In our KVM system architecture concept, we develop tailored high-availability solutions that precisely meet your requirements. Our core competence lies in the holistic integration of complex system landscapes.

Our technological focus areas:

Our goal: an integrated ecosystem that simplifies complexity

We create an intuitive user interface that gives your operators:

  • very fast access to critical systems
  • seamless integration of different platforms (SCADA, VMS, GMS)
  • flexible distribution of information to workstation monitors
  • simple dashboard configuration for operational teams

Top priority: absolute IT security and system stability

We develop solutions that deliver maximum performance even under extreme conditions.

Large-screen technology is the nervous system of modern control rooms – a critical tool for fast decision-making and situational awareness.

The central importance of large-screen visualisation:

  1. Information management
    • enables real-time display of complex data streams
    • creates a comprehensive overall view
    • reduces the cognitive load on operating staff
  2. Situation analysis
    • synchronous display of multiple information sources
    • enables fast pattern recognition
    • supports fast strategic decision-making
  3. Technical flexibility
    • control via video wall controllers
    • integration via KVM components
    • highly flexible display configurations
    • adaptable to specific room requirements
  4. Ergonomic benefits
    • central information display
    • minimised changes of gaze
    • reduced physical strain
    • support for collaborative working models
  5. Technological dimension
    • high-resolution displays
    • seamless screen joins
    • multifunctional display options
    • future-proof technology integration

We design your user interface as an intelligent communication centre

Our user-centred design solutions turn complex technical requirements into intuitive, precise operating concepts. We develop graphical interfaces based on the following principles.

Core competences:

  • highest ergonomics
  • maximum usability
  • optimised information processing
  • low-stress operation

Our design philosophy:

  • tailored to your processes
  • visual clarity
  • minimised cognitive load
  • fast information uptake

Core technological goals:

  • intuitive controls
  • clear graphical hierarchies
  • context-related information display
  • adaptive user interfaces

We see your user interface as a dynamic tool that simplifies complexity and increases your efficiency. Your requirements set the standard for our design.

How these planning steps work out in real projects is shown in the technical articles and references in our news and knowledge section.

Visit our showroom in Vienna Prater or Wieselburg

Experience control room planning, Barco visualisation, KVM, operator workstations, ergonomics and service live.

Appointments by arrangement. controlrooms GmbH supports you with analysis, planning, integration and ongoing service.

Request a showroom appointment

This content comes from an external provider (YouTube, Vimeo or Google Maps) and only loads once you accept marketing cookies.
FAQ

Frequently asked questions about control room analysis and planning

Why is an analysis necessary before planning a control room?

Because in a control room, people, room and technology have to work together permanently. Without a thorough analysis, the result is visibility problems, wrong workstation distances, unnecessary interfaces and systems that are difficult to maintain in 24/7 operation.

Which areas does controlrooms examine in the planning phase?

controlrooms looks at operator workstations, room layout, video wall, KVM architecture, signal paths, lighting, acoustics, climate, furniture, maintenance access and future expandability. What matters is not the individual component, but a secure overall architecture.

When should Barco CTRL or KVM over IT be considered in planning?

KVM over IT and Barco CTRL should be planned early if several sources, workstations, sites or video walls have to be connected flexibly and securely. Late KVM decisions often lead to unnecessary complexity and higher conversion costs.

Does planning also make sense for existing control rooms?

Yes. Existing control rooms in particular benefit from an as-is analysis, a modernisation concept, a risk analysis and clear migration planning. This allows conversions to be prepared without unnecessary interruptions to operation.

What distinguishes controlrooms from a pure supplier?

controlrooms plans and integrates as a complete provider. That means one point of contact for room, ergonomics, video wall, KVM, furniture, service and long-term operation – not several suppliers with an open interface risk.

Let's talk about your control∞room.

Whether new build, modernisation or expansion – we bring the experience of more than 25 years. No obligation, personal, on equal terms.

Request a consultation →
Request a consultation →